Kaia Engineering Design (MEP)
NEWDrawing sheets, not just calculations, for every building-services discipline.
Kaia Engineering Design is built for the five disciplines an MEP consultancy delivers: HVAC, fire, plumbing, ELV and electrical. It takes the architect’s drawing and a one-page brief, designs all five in dependency order on your own base, checks every value against your code before anything is drawn, and hands back drawing sheets with the receipt behind every number, for every type of building. The engineer of record signs. Kaia never signs, stamps or submits.
Why this exists
Production is still drawn by hand.
Construction documents and tender drawings carry an estimated 30–40% of the design fee. Calculated, coordinated, checked MEP drawings are still produced sheet by sheet.1
The errors live at the interfaces.
Design errors cost about 7% of contract value. They sit between disciplines and between documents: a load with no feeder, a duct through a tray, a schedule that disagrees with its layout.2
Today’s tools stop short.
Calculation tools do one calculation each. Coordination tools find clashes after the design is drawn. Drafting services sell hours, with no calculation or check behind the sheet.
- 1 Construction Documents phase share of the design fee: 30% (DesignFee.net, “Project phase fee distribution”) and 40% (Monograph, “Guide to design phases”). Source · Source
- 2 Lopez and Love, “Design Error Costs in Construction Projects”, Journal of Construction Engineering and Management 138(5): mean design error costs of 6.85% (direct) and 7.36% (indirect) of contract value across 139 projects. Source
What it designs
The full building-services package, checked before it is drawn.
All five disciplines, from the architect’s drawing and a one-page brief. For HVAC, fire, plumbing, ELV and electrical, Kaia produces:
- the design basis and costed system options;
- calculations, schematics and schedules;
- layouts per level, sized and placed;
- single-line diagrams;
- specifications, drafted for a person to review.
Designed in dependency order, with design bases a person signs.
- HVAC first, because it claims the most space and the largest load; then fire, plumbing and ELV; then electrical intake, once every other discipline’s equipment has a feeder.
- Each basis has its code register and applicability, with every value sourced from you or ledgered as an assumption, and a code value shown as awaiting until it is sourced.
- The lead signs off each discipline’s freeze list in that order. A change to anything a freeze cites reopens it.
Electrical lighting and power on your own base. Kaia reads your base drawing and draws the following on its own layers:
- lighting by room;
- the emergency set;
- circuits, with a number on every light point, and the DB schedule on the sheet;
- small power and EV points;
- the cable-tray spine;
- CCTV and PA.
Your layers, blocks and text come back unchanged.
Normal and escape lighting designed to the code.
- Normal lighting: room by room to the NBC 2016 Part 8 illuminance ranges.
- Escape lighting: to NBC 2016 Part 4, holding the escape route at 10 lx or more on its centreline from the emergency fittings alone. Any stair whose way out Kaia cannot read from your drawing is named for your review, never passed silently.
Checks before drawing. Every rulebook check must pass before a sheet is drawn. A failing check ends the run and releases nothing.
Coordination as a release gate.
- every load has exactly one feeder, and every feeder names its source;
- a clash run with real heights in the ceiling zones and shafts;
- layouts, schedules, schematics, the BOQ and the receipts must agree before the package releases.
Quantities and a rated BOQ. Quantities by room and floor are taken from the receipts, and the rated BOQ refuses any rate without its schedule, edition and correction slip. Value-engineering options come with their capex deltas.
Your corrections change the next run. Mark up a PDF or DXF, or type a note in the room. Kaia turns each mark into a proposed correction tied to the fittings, circuits and rooms it touches: a rule fix, an assumption replacement or an accepted variance. You accept or reject each one. The next run starts from what you accepted, the compare view shows what changed, and recurring corrections are proposed to you as practice defaults.
Excel workbooks with live formulas. Settings, schedules, calculations, assumptions, value engineering, quantities and the design bases come as live-formula workbooks. Each one must recalculate clean before it is released.
Your drawings in, drawing sheets out. Send DWG, DXF, a zip or a marked-up PDF from your browser. A DWG is converted on the server, your original is kept, and the conversion is checked against it before any run uses it. Kaia reads drawings in metres, millimetres, centimetres or inches and proves the scale from the drawing’s own measurements, never its header. Sheets come back as DXF and PDF: open them as DWG in your own CAD, or send, pull and save DWG from inside it with the Kaia plug-in.
Your names stay yours. Every output is swept for confidential names. A file that carries them is released to you inside your workspace and never leaves it: not for a demo, a proof or a publication.
A receipt and an evidence page per run. Every value is traceable to an input, a rule and a calculation. Nothing is published without your consent.
Signed in the product, in order. Each discipline lead accepts their own discipline’s package, then your engineer of record signs at issue. The package releases only on that signature. Kaia never signs, stamps or submits.
The five disciplines
First
HVAC
Room and block loads, ventilation and make-up air, stair, lift and lobby pressurisation, costed system options (VRF, chilled water, DX or hybrid), schematics and equipment schedules, and the sized duct and piping layouts with the plant rooms placed.
Second
Fire
Code applicability by occupancy and height, the hazard class of every space, hydraulic demand, storage and pump duty, the cause-and-effect matrix, and the sprinkler, hydrant, detection and exit-signage layouts, assembled into the submission set for your engineer of record.
Third
Plumbing
Water demand, storage and pressure zones, drainage with the invert chain, storm water and rainwater harvesting, treatment and the water balance, risers and schedules, and the fixture and pipe layouts per level.
Fourth
ELV
CCTV, access control, PA and voice evacuation, structured cabling, BMS points and EV-charging management: the loads, UPS and batteries, risers and block diagrams, and the device layouts.
Fifth
Electrical
Lighting and the emergency set, circuits and DB schedules, small power and EV, connected load and maximum demand, transformer, DG and UPS, cable sizing, earthing and lightning protection, single-line diagrams and every sheet family, fed from the other four disciplines’ schedules.
Every building type
Kaia reads each building’s use and designs to it, from a single villa to a high-rise tower, with a different use on each level where the building has one. Each type carries its own profile of loads, lighting levels, diversity, indoor conditions and code values, held as configuration. Where a value is not in the profile, Kaia states the assumption it used and flags it for your engineer.
Residential
Apartments, towers and typical floors
Villas
Including GCC villas
Commercial and office
Retail
Hospitality
Hotels
Healthcare
Hospitals
Education and institutional
Assembly
Halls, auditoria, restaurants and food courts
Industrial
Storage and warehouses
Data centres
Airport terminals
Car parks
Basement, podium and multi-level
Mixed use
A different use on each level
Oil-and-gas facility buildings
Control rooms, substations and switchgear rooms, administration, workshops, warehouses, accommodation and canteens, laboratories, fire stations and gatehouses
On an oil-and-gas site, Kaia designs the buildings, never the pipelines or the process plant. The site’s hazardous-area classification drawing is an input from your process-safety engineer, and nothing in a classified area is released until a person signs it.
One stage at a time
One stage at a time. Each stage ends with its owner’s sign-off before the next begins, and Kaia never skips one.
- 01
Practice setup
Your practice
Your standards, layers, lighting levels and factors, versioned on every receipt.
- 02
Base intake
Your practice
The architect’s base read as drawn: scale proved, rooms typed from the base’s own names, nothing edited.
- 03
Design basis
Discipline lead
One basis per discipline, every value sourced or ledgered, the freeze list signed.
- 04
System selection
Discipline lead
Costed options, the value-engineering register and the space each system needs.
- 05
Calculations
Discipline lead
Every value computed by engine code, with its receipt.
- 06
Schematics and schedules
Discipline lead
Risers, single-line diagrams, cause-and-effect and equipment schedules.
- 07
Layouts
Discipline lead
The plates per level, drawn only after every check passes.
- 08
Coordination
Coordinating engineer
One feeder per load, the clash run with heights, every document agreeing.
- 09
Documents
Coordinating engineer
Reports, specifications drafted for a person, quantities and the rated BOQ.
- 10
Issue
Engineer of record
The signature that releases the package.
- 11
Review
Engineer of record
Your markup becomes the start of the next run.
How the checks work
Checked before drawn.
Every value is computed and checked against the rulebook before a line is drawn. No number on a sheet is a model’s guess.
Traceable after.
The receipt ships with every sheet: inputs, settings version, every check and what the run did not do. No receipt, no download.
Signed by your engineer.
The engineer of record signs the package, and each discipline lead signs their own discipline. Kaia never signs, stamps or submits to an authority.
Code packs
One engine reads a versioned code pack per jurisdiction. The project chooses the code and edition; Kaia never does.
- India: NBC 2016 and SP 7:2026, with both citations on every rule.
- The GCC: the authorities’ requirements per country, including the UAE Fire and Life Safety Code of Practice and the Dubai Building Code.
- Saudi and US packs on the same pattern.
- Your practice’s standards on top: they may tighten a value, never lower a code minimum.
Your files
Kaia works in the files your practice already uses.
- DWG, DXF, a zip or a marked-up PDF from your browser; a DWG is converted on the server and your original kept.
- A plug-in for your own CAD that sends, pulls and saves DWG from inside it, and never touches a layer that is not Kaia’s.
- IFC as a base, and BIM-model connectors that export issues to your coordination tools when your BIM execution plan calls for them.
- Excel workbooks with live formulas, PDF plates and an evidence PDF; your marked PDF comes back into the room.
Why Kaia
All five disciplines, one engine.
Most tools cover one discipline, or start from a BIM model. Kaia is built for HVAC, fire, plumbing, ELV and electrical in one set, on the 2D base your practice already works in.
Sheets, not just numbers.
Kaia’s output is the drawing sheet on your base, with your layers and its own. The calculation behind every value comes with it.
Every correction compounds.
Your markup becomes the start of the next run. Your practice’s standards and rules grow with each project, and you approve every change.
Who it's for
MEP consultancies and construction groups — from five-engineer practices to firms running large AutoCAD and Revit teams — that deliver calculated, coordinated building-services drawings. India and the GCC first; the code packs carry it anywhere.